Inangahua Combined Three Waters Project

Design and construction upgrade strengthening drinking water and stormwater resilience for Buller District Council.

SERVICES

Design Drainage Trenchless

Location

Inangahua, Buller District

Status

Completed in 2025

Works Description

Delivered under an NZS 3916:2013 design and construct contract, the project involves 835m of new DN63 PE80B drinking water rising and falling mains. Installation combined open-trench and directional drilling methods. Stormwater upgrades included an engineered swale drain and 600mm RCRRJ Class 4 concrete stormwater mains installed beneath State Highway 6.

Watermain Upgrades

835m of PE80B drinking water mains installed via open-trenching and directional drilling.

Live Network Operations

Live tie-ins and commissioning completed while maintaining uninterrupted service to residents.

Highway Stormwater Works

600mm concrete stormwater mains successfully installed under State Highway 6.