Amuri Irrigation
Amuri Irrigation Scheme Culverden
Works Description
The Amuri Irrigation Scheme is designed to deliver water to over 22,000 hectares in the Amuri Basin, taking water from the Waiau and Hurunui Rivers. The project included the construction and installation of a 130km+ pipe distribution network across North Canterbury. The scheme delivers pressurised irrigation water to 160 property offtakes complete with isolation, flow measurement and pressure management, as well as construction and integration of the intake infrastructure (ponds), road crossings and river crossings.
Delivery Type
Sub Contractor
Completion
December 2017
Contract Value
$5.5 million